![]() ![]() Section 23: OPA Elections Subject: Trash & Flooding Msg# 863178
|
||||||
In my case, they did pull the replacement pipe under the roadway. They did, however, cut a 3 foot by 8 foot section out in the center of the circle because that is where the main was located. Another hole was dug near my meter. | ||||||
|
||||||
For reference, the above message is a reply to a message where: Speaking of road cuts, I have often wondered why the builders, or who ever digs up the roads isn't required to avail themselves of equipment that can dig under the roadways without messing up the pavement. |
Calendar |
![]() 3/29/2025 - 9:00 A.M. |
![]() 4/26/2025 - 9:00 A.M. |
![]() 5/24/2025 - 9:00 A.M. |
![]() 6/28/2025 - 9:00 A.M. |
![]() 7/26/2025 - 9:00 A.M. |