Section 5: OPA Board Subject: Another Sign Flap Msg# 1202465
|
||||||
So how can inspectors now be taking signs? Because don’t you agree if they cant remove them the time runs out and they take them down anyway. | ||||||
|
||||||
For reference, the above message is a reply to a message where: Kerry: That pretty much sums it up. We installed 5 construction signs for 5 new home starts on the Parkway and the ECC actually only took 1 or 2 and knocked the other 3 over. I don’t know if you remember our construction signs but they were substantial while still meeting all of the size, material and color regulations. Marty |