The plan is gathering dust in a file cabinet. | ||||||
|
||||||
For reference, the above message is a reply to a message where: Joe, For sure there was a plan ready to go for permitting and the bidding process for the drainage and flooding we are discussing. Yes the driver of the cost as I have said before is the pipe size, materials used to make pipe and the size of storm you are designing for. The plan I am talking about had other things in it that may already be done I have no idea what has been done in 10 years but it can be easily obtained I would think. |