9/20/2020 12:50:10 PM
Reply
or ReplyNewSubject
Section 5: OPA Board Subject: Bainbridge Drainage Msg# 1098233
|
||||||
Well I guess because I thought I was doing a pretty good job answering them myself
My sources tell me the flow into the River Run pond cannot be increased beyond what it is now. Can you verifty this? As previously mentioned, 50,000 cubic feet of additional retention is not going to do much. What is the acreage feeding into the pond? If there is less flooding within OP due to phase 1 work there will be greater flows under Beauchamp in peak runoff periods. Can you verify this with the engineer? What would be any possible location to direct more runoff from that area into the bay? The only possibility I am aware of is some sort of a system directing the water down Beauchamp Road. I thought I heard that could cost $10 million. Can you ask the engineer about that? |
||||||
|
||||||
For reference, the above message is a reply to a message where: “We have an engineer we are paying. Why is he not answering these questions? Or is no one asking him?“ Well I guess because I thought I was doing a pretty good job answering them myself I will see if I can get an explanation that is engineered deeper for you. Get it? Engineered? Lol..ok I am off to bed. Have a great night! |
Calendar |
OPA Board Meeting - Golf Clubhouse
1/25/2025 - 9: A.M. |
OPA Board Meeting - Golf Clubhouse
2/22/2025 - 9:00 A.M. |
OPA Board Meeting - Golf Clubhouse
3/29/2025 - 9:00 A.M. |
OPA Board Meeting - Golf Clubhouse
4/26/2025 - 9:00 A.M. |
OPA Board Meeting - Golf Clubhouse
5/24/2025 - 9:00 A.M. |