Steve Soule had 3-4 different designs as I recall depending on pipe size and layout . I think we had a plan and maybe even a quote. My best memory says 4 million was a Cadillac 100 year storm design that was not even considered . I think we could have done it for like 2 million or less for a 50 year storm | ||||||
|
||||||
For reference, the above message is a reply to a message where: Kerry, what is your recollection of the cost to run a pipe down Beauchamp Road per the plans you had at PW? I recall you saying it was around $4 million back then, but then mistakenly thinking 14 in my responses to Marty. |