![]() ![]() ![]() Section 5: OPA Board Subject: Bainbridge Drainage Msg# 1098245
|
||||||
Marty, that is exactly what I was thinking but I was afraid to print it! I have never heard 10 million on any project I was involved in! Jimmy B may remember but I will look back and see if I have any info! I remember what Colby has proposed but it drained on our property all the way to the park but it has been awhile since I was involved! its time to slay this Dragon! Overdue!! | ||||||
|
||||||
For reference, the above message is a reply to a message where: Joe: I should keep my nose out of this but I can’t help myself. Two things: 1. To the best of my knowledge the engineering with regard to the moving of water to a pond at the old Pines Shore golf property was done by OPA under Bob Thompson and was terribly flawed. The entire plan was more about purchasing that property for a new public works operation and athletic fields. Drainage was nothing more then a strawman. 2. The cost to improve the drainage down Beauchamp Road with properly sized culverts and including a storm water management pond located down by the existing boat ramp property was no where close to $10M dollars. In my opinion this is the only feasible option. |
Calendar |
![]() 3/29/2025 - 9:00 A.M. |
![]() 4/26/2025 - 9:00 A.M. |
![]() 5/24/2025 - 9:00 A.M. |
![]() 6/28/2025 - 9:00 A.M. |
![]() 7/26/2025 - 9:00 A.M. |