Section 4: General Subject: Drainage Work Msg# 1126617
|
||||||
YUP Can be costly . $$$ Figures like those were mentioned in discussions here, earlier.
I was wondering about pond level management, for example with a weir controlling releases. |
||||||
|
||||||
For reference, the above message is a reply to a message where: Tom, We have information on conveying water from that area to the river. The project cost depends on how robust of a rainfall we want to deal with. At the upper end the current estimates are about 12 million. At the lower end between 2-3 million. Frank |